Osprey Holdings Bulkhead Stabilization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Stabilize the bulkhead by filling voids in the soil on the landward side of the timber bulkhead with SW-RP1 poly resin. Drilling 4 holes in bulkhead and installing a jet filter system to drain groundwater and over-topping marine water into Puget Sound.
- Status
- Prospective
- Sector
- Water Supply and Storage, Forest Products and Packaging, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Vashon, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Osprey Holdings Bulkhead Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Stabilize the bulkhead by filling voids in the soil on the landward side of the timber bulkhead with SW-RP1 poly resin. Drilling 4 holes in bulkhead and installing a jet filter system to drain groundwater and over-topping marine water into Puget Sound. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vashon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
