Otay Water Treatment Plant OWTP
Closed · California · Last reported Jun 2024
Source: Dodge USA
Scope - The Contractor shall furnish all labor, materials, equipment, and incidentals required to install new filter media for 16 filters. The Contractor shall remove the existing media from all 16 filters and replace with new media. New media will include the installation of sand and GAC. Placement of the new GAC shall be accomplished hydraulically via slurry transport through an eductor, slurry
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Chula Vista, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Otay Water Treatment Plant OWTP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Contractor shall furnish all labor, materials, equipment, and incidentals required to install new filter media for 16 filters. The Contractor shall remove the existing media from all 16 filters and replace with new media. New media will include the installation of sand and GAC. Placement of the new GAC shall be accomplished hydraulically via slurry transport through an eductor, slurry pump, blow case or from a specially built bulk truck. Contractor is responsible for hauling and d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Chula Vista |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
