OTHER 1 Post Office SQ
Open · Massachusetts
Source: City of Boston
Replacement of existing server room air conditioners, installation of new heat pump at conference room and installation of new UPS system in server room, to the 39th and 40th Floor offices. No new construction required.
- Status
- Prospective
- Sector
- Residential, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 1 Post Office SQ
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of existing server room air conditioners, installation of new heat pump at conference room and installation of new UPS system in server room, to the 39th and 40th Floor offices. No new construction required. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
