OTHER 100 Arlington ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
The fire pump room has been relocated to Piedmont St from Sturt St. The room is directly accessible from the street. The fire command center has been moved 1 bay over from its previous location, directly accessible thru the building lobby. General reconfiguration of spaces on the B1 and B1 levels. Limited spatial reconfiguration on levels 2 &; 3 &; minor revisions on level 4. The fire protection d
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 100 Arlington ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The fire pump room has been relocated to Piedmont St from Sturt St. The room is directly accessible from the street. The fire command center has been moved 1 bay over from its previous location, directly accessible thru the building lobby. General reconfiguration of spaces on the B1 and B1 levels. Limited spatial reconfiguration on levels 2 &; 3 &; minor revisions on level 4. The fire protection drawings have been updated to indicate the sprinkler heads at the head of the new window openings on the east wall, required per the approved variance for these opening, as well as the new plan configurations noted above. The fire alarm drawings have been updated per the plan configuration changes &; the fire pump room &; fire command center relocations noted above. Amend ALT45267 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
