logo
ProjectOpenBP

OTHER 110 Broad ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

? CEILING KITCHEN AND LIVING ROOM AREAS BUILD A BOX FRAME FOR THE PLUMBING PIPES, ABOUT 3FEE TO 4FEE WIDTH, THE HIGH 17 INCHES FOLLOWING THE EXISTING BOX LEVEL HIGH, BRING TO THE EXISTING LEVEL. INSTALL DRYWALL, PLASTER OR TAPED, SAND, APPLY ONE COAT PRIMER, TWO COATS PAINT ON THE BOX AREA ONLY. ? BEDROOM AREAS BUILD A BOX FRAME FOR THE PLUMBING PIPES, ABOUT 3FEE TO 4FEE WIDTH, THE HIGH 17 INCHES

Status
Prospective
Sector
Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about OTHER 110 Broad ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “OTHER 110 Broad ST” is an infrastructure initiative in the Commercial sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

? CEILING KITCHEN AND LIVING ROOM AREAS BUILD A BOX FRAME FOR THE PLUMBING PIPES, ABOUT 3FEE TO 4FEE WIDTH, THE HIGH 17 INCHES FOLLOWING THE EXISTING BOX LEVEL HIGH, BRING TO THE EXISTING LEVEL. INSTALL DRYWALL, PLASTER OR TAPED, SAND, APPLY ONE COAT PRIMER, TWO COATS PAINT ON THE BOX AREA ONLY. ? BEDROOM AREAS BUILD A BOX FRAME FOR THE PLUMBING PIPES, ABOUT 3FEE TO 4FEE WIDTH, THE HIGH 17 INCHES FOLLOWING THE EXISTING BOX LEVEL HIGH, BRING TO THE EXISTING LEVEL. INSTALL DRYWALL, PLASTER OR TAPED, SAND, APPLY ONE COAT PRIMER, TWO COATS PAINT ON THE BOX AREA ONLY. ? ABOVE KITCHEN CABINETS INSTALL CROW MOLDING ? KITCHEN, LIVING ROOM, AND BEDROOM CEILING ONLY PAINT. ? COVER UNFINISHED COLUMN IN THE LIVING ROOM. INSTALL DRYWALL, PLASTER OR TAPED, SAND, APPLY ONE COAT PRIMER, TWO COATS PAINT ON THE AREA ONLY. ELECTRICAL WORK ? Install wire mold for pendant light and install pendant light ? Install a new light in living room from a junction box and connect to existing 2 dimmer switches to control one light in the living room and the other one to control the pendant light. ? Change lighting switch from dimming switch to a regular switch. (kitchen recessed lights) ? Run a dedicated circuit for bedroom ? Move fire alarm from wall to ceiling space

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project