OTHER 145-147 Endicott ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
fire escape repairs to side platforms and common balconies remove and replace all bar grating all levels 75" per level total of aprox 300 ft. remove square bolts replace with new grade 5 hardware through-out add missing j-bolts bar grating to bracket remove and replace six brackets with web support remove and replace all lower steps cantilever with new 10" deep threads remortar all areas around st
- Status
- Prospective
- Sector
- Steel, Commercial, Government, Metal
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 145-147 Endicott ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | fire escape repairs to side platforms and common balconies remove and replace all bar grating all levels 75" per level total of aprox 300 ft. remove square bolts replace with new grade 5 hardware through-out add missing j-bolts bar grating to bracket remove and replace six brackets with web support remove and replace all lower steps cantilever with new 10" deep threads remortar all areas around steel to brick connections |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
