OTHER 185-189 Chestnut Hill AV
Open · Massachusetts
Source: City of Boston
#189 : Side Egress System: 1st platform requires re-bolt of railing connections. 2nd and 3rd platforms require re-bolt of railing connections and channel.
Rear Egress System: Top platform railing connections require re-bolting where needed. Top flight stringers and steps to be re-bolt as needed. 2nd flight requires hammer test and re-bolt steps as needed. 1st platform railing connectio
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 185-189 Chestnut Hill AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | #189 : Side Egress System: 1st platform requires re-bolt of railing connections. 2nd and 3rd platforms require re-bolt of railing connections and channel. Rear Egress System: Top platform railing connections require re-bolting where needed. Top flight stringers and steps to be re-bolt as needed. 2nd flight requires hammer test and re-bolt steps as needed. 1st platform railing connections require re-bolting Alcove system: 1st platform flooring requires securing. 3rd level platform requires re-bolting |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
