OTHER 27 Gordon ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Repair the exterior front egress landing and steps without changing the existing size. Remove two trees and grind stump. Excavate landing area 18 inches down to pour pad with remesh steel sheets. Tie into the header board or foundation with the ledger board. All joists installed with hangers. Secure stringers onto the rim board with hangers. Install trex select composite boards for the landing and
- Status
- Prospective
- Sector
- Steel, Commercial, Government, Metal
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 27 Gordon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Repair the exterior front egress landing and steps without changing the existing size. Remove two trees and grind stump. Excavate landing area 18 inches down to pour pad with remesh steel sheets. Tie into the header board or foundation with the ledger board. All joists installed with hangers. Secure stringers onto the rim board with hangers. Install trex select composite boards for the landing and steps with PVC on the risers and trim. Install 36 inches in height guard and railing. Build less than 3ft retaining garden bed wall approx. 15ft long |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
