OTHER 3 Carmel ST
Sector: Metal • Location: Mission Hill, Massachusetts, United States of America
Source: City of Boston
MARVIN CLAD ULTIMATE INSERT DOUBLE HUNG WINDOWS Replace the 12 windows in the copper bays for both the second and third floors (Windows 200,203,204,205,211,212 and the windows of the same size directly above them on the 3rd floor). INSTALLATION: -RETROFIT INTO EXISTING OPENINGS AS PER ARCHITECTS DRAWINGS -INTERIOR AND EXTERIOR CAULKING
- Status
- Prospective
- Sector
- Metal, Commercial, Government
- Location
- Mission Hill, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 3 Carmel ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | MARVIN CLAD ULTIMATE INSERT DOUBLE HUNG WINDOWS Replace the 12 windows in the copper bays for both the second and third floors (Windows 200,203,204,205,211,212 and the windows of the same size directly above them on the 3rd floor). INSTALLATION: -RETROFIT INTO EXISTING OPENINGS AS PER ARCHITECTS DRAWINGS -INTERIOR AND EXTERIOR CAULKING |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mission Hill |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
