OTHER 35 Washington ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Cut and repoint all deteriorated mortat joints directly above apt 6 living room window from roof-line to concrete lintel to stop water penetration Repair all spauled or damaged bricks at above location Caulk around windows as needed Remove and dispose of all debris associated with the above construction Provide lift, scaffolding necessary to complete above work
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 35 Washington ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Cut and repoint all deteriorated mortat joints directly above apt 6 living room window from roof-line to concrete lintel to stop water penetration Repair all spauled or damaged bricks at above location Caulk around windows as needed Remove and dispose of all debris associated with the above construction Provide lift, scaffolding necessary to complete above work |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
