OTHER 360 Talbot AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Installing two 14x42 frame tents side by side to create a 14x84 covered space, a 20x20 frame, and two 9x10 frame tents for the Codman Square fundraising event. Installing on 06/22/23 and removing on 06/23/23. No alcohol is being served.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 360 Talbot AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installing two 14x42 frame tents side by side to create a 14x84 covered space, a 20x20 frame, and two 9x10 frame tents for the Codman Square fundraising event. Installing on 06/22/23 and removing on 06/23/23. No alcohol is being served. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
