OTHER 4-12 Elko ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
No Structural changes, HVAC changeover to heat pumps for efficiency for all units in the building. Decommission existing natural gas building boilers and dispose. Change over the load centers in each unit, patch and paint as necessary. Aesthetic repair to shared hallways of carpet and paint.
- Status
- Prospective
- Sector
- Natural Gas, Commercial, Government, Manufacturing (Industrial)
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 4-12 Elko ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | No Structural changes, HVAC changeover to heat pumps for efficiency for all units in the building. Decommission existing natural gas building boilers and dispose. Change over the load centers in each unit, patch and paint as necessary. Aesthetic repair to shared hallways of carpet and paint. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
