OTHER 5 Wheelock AV
Sector: Water Supply and Storage • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
Remove & dispose of all existing shingles from top roof; Furnish & install ice & water shield along of all edges of the roof 3’ up. (top & 2nd flr roof); Furnish & install 15 lb. black felt. (top & 2nd flr roof); Furnish & install drip edge at all edges of roof. (top & 2nd flr roof); Furnish & install architectural roof shingles (color by owner). (top & 2nd flr roof); Furnish & install new
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about OTHER 5 Wheelock AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove & dispose of all existing shingles from top roof; Furnish & install ice & water shield along of all edges of the roof 3’ up. (top & 2nd flr roof); Furnish & install 15 lb. black felt. (top & 2nd flr roof); Furnish & install drip edge at all edges of roof. (top & 2nd flr roof); Furnish & install architectural roof shingles (color by owner). (top & 2nd flr roof); Furnish & install new lead flashing around chimney; Excavate 1’ down on the basement and install 4” concrete onto basement floor; Reface walls around the basement; Furnish & install LVL beam on the basement; Furnish & install columns in the basement only as needed; Remove & Dispose of all material & debris. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
