logo
ProjectOpenBP

OTHER 8-8a Allstate RD

Open · Massachusetts

Source: City of Boston

Concrete pad for 6000 lbs unit. Removal of asphalt, excavation of material, haul to Northgate Recycling, install 6" of compacted crushed stone, #4 rebar 12" o.c. each way, 8" thick 4000 psi concrete. Size of pad 7' x 12'. Construct chain link fence enclosure with 3' gate. Install bollards

Status
Prospective
Sector
Road, Steel, Cement, Commercial, Government
Location
Dorchester, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about OTHER 8-8a Allstate RD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “OTHER 8-8a Allstate RD” is an infrastructure initiative in the Road sector, located in Dorchester, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Concrete pad for 6000 lbs unit. Removal of asphalt, excavation of material, haul to Northgate Recycling, install 6" of compacted crushed stone, #4 rebar 12" o.c. each way, 8" thick 4000 psi concrete. Size of pad 7' x 12'. Construct chain link fence enclosure with 3' gate. Install bollards

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Dorchester

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Road, Steel, Cement, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project