logo

Ottawa Highway 7 Expansion

Sector: Bridge • Location: Canada

Source: Road Traffic Technology

Project
Closed

The location of Highway 7. Highway 7 is 716km long. Highway 7 at Central Frontenac. Highway 7 passing through Marmora, Ontario. Highway 7 passing through the city of Kawartha Lakes. Highway 7 is located in the Canadian province of Ontario. It stretches from Highway 40 in southwestern Ontario to Highway 417 in southwest Ottawa. The 716km long highway is also known as the Trans-Canada Highway by nat

Project Information FAQ

Project Information

4 Q
The project “Ottawa Highway 7 Expansion” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The location of Highway 7. Highway 7 is 716km long. Highway 7 at Central Frontenac. Highway 7 passing through Marmora, Ontario. Highway 7 passing through the city of Kawartha Lakes. Highway 7 is located in the Canadian province of Ontario. It stretches from Highway 40 in southwestern Ontario to Highway 417 in southwest Ottawa. The 716km long highway is also known as the Trans-Canada Highway by natives of Ontario. In 1997 and 1998, the highway was transferred to the respective regional and municipal governments by the Ontario Ministry of Transportation. As a result, the highway has two separate sections namely the western and eastern segments. The western segment covers up to 152.6km. It extends from Elginfield in Middlesex County to the Halton – Peel border at Norval. The eastern segment covers a distance of 384km and extends from Donald Cousens Parkway in Markham to Highway 417. The highway serves 14 counties and is the central Ontario route between Peterborough and Ottawa for the Trans-Canada Highway. The capacity of existing roads is insufficient for the demands of growing communities. There were many fatal and serious accidents on the highway. Hence the widening of the highway was planned. The project involves widening of the highway to a four lane freeway, which runs from Highway 417 to Carleton Place. The expansion will improve safety, reduce traffic congestion and improve commute times. The multiphase expansion project started in 2006 and is yet to be completed, as of January 2012. The $48m contract for phase one was awarded to Ottawa-based R.W. Tomlinson. Highway 7 was widened to four lanes during this phase of the project. The expansion took place from Highway 417 to Jinkinson Road. It added a new interchange at Hazeldean Road. The first phase was completed in 2008. The second phase, which started in 2008, involves construction from Jinkinson Road to west of Ashton Station Road. The length of expansion will be approximately 12km. The works of the second phase are expected to be completed in late 2010. The third and final phase of the project began in early 2010 and work is underway. The twinning of Highway 7 from Ashton Station Road to McNeely Avenue at Carleton Place will be carried out during this phase. A new interchange is planned for construction at Cemetery Road and Appleton Side Road, while new service roads will also be built parallel to the north and south sides of the highway. In addition, an expansion from Ottawa to Carleton Place is also being carried out under phase three. The final phase of the project is being carried out by Aecon Group and is estimated to cost approximately $107.4m. Currently, the government is also planning to extend the broadening of the highway to Peterborough. As a part of the expansion, the Scugog River Bridge in Kawartha Lakes will also be widened. The bridge lies towards the west of the highway. The widening is currently underway and is expected to cost $10m. The widening project started in 2008 and was completed by 2010. The widening contract worth $13.9m was awarded to Morrisburg based Cruickshank Construction. Aecon Construction and Materials based in Toronto was awarded a $25m contract for repairing the Scugog River Bridge, constructing the interchange, along with other minor repairs. The transportation authority of Ottawa is investing $319m for the expansion of Highway 7. The Ernie Eves government is also contributing $85m for the project. Additionally, the Government of Ottawa is investing nearly $170m in the project. Since 2003, the McGuinty government has granted $9.3bn for highways and other projects related to transportation. The cost incurred so far, on both Highway 7 and 417, is $322m.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data