Ottensman Hall Central Chilled Water Plant Expansion
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
In general, the work consists of: demolition of an existing chiller and cooling tower in Markee Pioneer Student Center. Installation of one new 900-ton centrifugal chiller in the existing Markee Pioneer Student Center mechanical room. The existing cooling tower support structure will be modified as necessary for the installation of the new cooling tower. All necessary piping, pumps, valves, contro
- Status
- Under Construction
- Sector
- Water Supply and Storage, Education, Power Generation (CCGT), Commercial
- Location
- Platteville, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ottensman Hall Central Chilled Water Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of: demolition of an existing chiller and cooling tower in Markee Pioneer Student Center. Installation of one new 900-ton centrifugal chiller in the existing Markee Pioneer Student Center mechanical room. The existing cooling tower support structure will be modified as necessary for the installation of the new cooling tower. All necessary piping, pumps, valves, controls, motors, and electrical wiring will be replaced to serve the new chiller. New piping will incl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Platteville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Power Generation (CCGT), Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
