logo

Ottumwa Regional Apron Reconstruction

Sector: Government • Location: Ottumwa, Iowa, United States of America

Source: Dodge

Project
Bidding

Phase 1 Construction includes removing asphalt pavement and placing new PCC pavement for the apron area SW of the large hangar. Any inlet work that is needed to reinforce the existing structures will take place during this phase. An alternate bid item to be completed would include pavement removal, PCC pavement construction, and new pavement markings on the reconstructed taxiway. The duration of P

Status
Prospective
Sector
Government, Road, Commercial, Manufacturing (Industrial)
Location
Ottumwa, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Ottumwa Regional Apron Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ottumwa Regional Apron Reconstruction” is an infrastructure initiative in the Government sector, located in Ottumwa, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 1 Construction includes removing asphalt pavement and placing new PCC pavement for the apron area SW of the large hangar. Any inlet work that is needed to reinforce the existing structures will take place during this phase. An alternate bid item to be completed would include pavement removal, PCC pavement construction, and new pavement markings on the reconstructed taxiway. The duration of Phase 1 is 25 working days. Phase 2 Construction includes full depth patching, crack repair, new j...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Ottumwa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Commercial, Manufacturing (Industrial)

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project