Ourinhos Hydro Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
In November 1999, the Brazilian company Guascor was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 44-MW hydro power plant located in the Paranapanema River, state of Parana. Information on the other bidders was not available.
The bidding criteria set by the federal regulatory agency ANEEL was the highest p
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Power Generation (CCGT)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ourinhos Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In November 1999, the Brazilian company Guascor was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 44-MW hydro power plant located in the Paranapanema River, state of Parana. Information on the other bidders was not available. The bidding criteria set by the federal regulatory agency ANEEL was the highest payment to the government for the concession rights. The company agreed to pay US$ 0.037 million (BRL 0.089 million) in yearly installments during the life of the contract, starting once operations commence (using a discount rate of 10%, the present value of this contribution was estimated at US$ 0.35 million). The contract was signed in May 2000, and sponsor created the company Ourinhos Energia to lead the project during the 35-year contract period. In 2003, construction works were stalled due to financial difficulties faced by the private sponsor. In June 2003, Companhia Brasileira de Alumínio, a wholly-owned subsidiary of Grupo Votorantim, acquired the shares of Ourinhos Energia. The sponsor committed to invest US$ 49.4 million (BRL 120 million) in the power plant. Construction works resumed in 2003, and perations commenced by the end of 2005. Financing for the project was provided with equity. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Power Generation (CCGT) |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
