Overlay & Patching
Sector: Water Supply and Storage • Location: Estes Park, Colorado, United States of America
Source: Dodge USA
Reconstruction, repaving, or patching of multiple roadways in the Town of Estes Park. Contractor shall supply all labor, materials, and equipment necessary to complete the work in accordance with the contract specifications. The Work is generally described as follows: 1. West Elkhorn Avenue: 3-inch mill, 3-inch overlay (2 lifts); spot repair curb, gutter, sidewalk, storm sewer, pavement marking an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Reconstruction, repaving, or patching of multiple roadways in the Town of Estes Park. Contractor shall supply all labor, materials, and equipment necessary to complete the work in accordance with the contract specifications. The Work is generally described as follows: 1. West Elkhorn Avenue: 3-inch mill, 3-inch overlay (2 lifts); spot repair curb, gutter, sidewalk, storm sewer, pavement marking and striping. 2. Pine Knoll Drive: complete reconstruction including unclassified excavation, concr... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
