Overlayfall Fy 24-25
Closed · Arizona · Last reported Jul 2024
Source: Dodge USA
Thescope of work includes furnishing of all labor, materials, equipment, fixturesand services required for a mill and fill pavement replacement on PrescottCountry Club Boulevard and Turquoise Circle in Prescott Country Club; inaddition to a 2-inch asphaltic concrete overlay on Jefferson Street in Mayer.The total project length is 15,218 feet with 35,123 square yards of bituminouspavement removal b
- Status
- Closed
- Sector
- Cement, Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Prescott, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Overlayfall Fy 24-25
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thescope of work includes furnishing of all labor, materials, equipment, fixturesand services required for a mill and fill pavement replacement on PrescottCountry Club Boulevard and Turquoise Circle in Prescott Country Club; inaddition to a 2-inch asphaltic concrete overlay on Jefferson Street in Mayer.The total project length is 15,218 feet with 35,123 square yards of bituminouspavement removal by Milling, 4,798 tons of asphaltic concrete overlay with PG64-22 binder, and 845 tons of fiber-re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Prescott |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
