Overlook Drive Sanitary Sewer Extension
Sector: Power Generation (CCGT) • Location: Indiana, United States of America
Source: Dodge USA
Project includes the following Work: The project includes but is not limited to installing grinder pump stations at eleven (11) homes on Overlook Drive and connecting the force main to the existing gravity sewer collection system. The work includes installation of eleven (11) grinder pumps, 1,100' of 2" force main, 300' of 3" force main, 300' of 6" gravity laterals, 1,400' of 1-1/4" discharge serv
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage, Residential, Waste Processing and Treatment, Government, Commercial, Raw Materials
- Location
- Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Overlook Drive Sanitary Sewer Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes the following Work: The project includes but is not limited to installing grinder pump stations at eleven (11) homes on Overlook Drive and connecting the force main to the existing gravity sewer collection system. The work includes installation of eleven (11) grinder pumps, 1,100' of 2" force main, 300' of 3" force main, 300' of 6" gravity laterals, 1,400' of 1-1/4" discharge service lines, associated electrical, and demolition of existing septic tanks. This also includes all... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Residential, Waste Processing and Treatment, Government, Commercial, Raw Materials |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
