Owls Head WRRF Chlorination System Optimization
Sector: Water Supply and Storage • Location: Bay Ridge, New York, United States of America
Source: Dodge USA
1.Interim Disinfection System -Installation, testing and commissioning of an interim disinfection system, also furnishing. Connection to the existing sodium hypochlorite piping in the pipe gallery. Construction of a truck chemical receiving station. 2.Chlorine Contact Tank ( CCT ) Modifications - Installation of 4 (four) Hach CL 17 Total Residual Chlorine (TRC) analyzers at the influent and efflue
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Advanced Electronics
- Location
- Bay Ridge, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Owls Head WRRF Chlorination System Optimization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.Interim Disinfection System -Installation, testing and commissioning of an interim disinfection system, also furnishing. Connection to the existing sodium hypochlorite piping in the pipe gallery. Construction of a truck chemical receiving station. 2.Chlorine Contact Tank ( CCT ) Modifications - Installation of 4 (four) Hach CL 17 Total Residual Chlorine (TRC) analyzers at the influent and effluent locations. Installation of level indicating sensor in each CCT to monitor level over the efflu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Bay Ridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Commercial, Waste Processing and Treatment, Manufacturing (Industrial), Advanced Electronics |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
