Owosso New Secondary Clarifier
Sector: Power Generation (CCGT) • Location: Owosso, Michigan, United States of America
Source: Dodge USA
The Project consists of furnishing all supplies for and constructing the Secondary Clarifier and placing it in operation Removal of drying bed. Provide and installation of secondary clarifier tank and associated mechanisms. Installation of new drying bed. Provide and installation of one new tertiary disc filter. Yard piping improvements. Provide and installation of one new sludge pump. Site paving
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Owosso, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Owosso New Secondary Clarifier
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of furnishing all supplies for and constructing the Secondary Clarifier and placing it in operation Removal of drying bed. Provide and installation of secondary clarifier tank and associated mechanisms. Installation of new drying bed. Provide and installation of one new tertiary disc filter. Yard piping improvements. Provide and installation of one new sludge pump. Site paving. Electrical Improvements: Yard lighting. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Owosso |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
