Oyan Dam Revitalization
Sector: Water Supply and Storage • Location: Abeokuta, Ogun, Nigeria
Source: Platform Times
The Oyan Dam project, initiated in 1977, aims to provide sustainable water supply, food security, and hydroelectric power generation. However, it has been largely neglected, leading to overreliance on borehole drilling in residential areas, which poses environmental risks. Former President Olusegun Obasanjo has called for its revitalization to address these issues and improve water management in N
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Residential, Power Generation (CCGT)
- Location
- Abeokuta, Ogun, Nigeria
- Updated
- 22 Jul 2026
- Source
- Platform Times
ConstructChat
Ask ConstructChat about Oyan Dam Revitalization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Oyan Dam project, initiated in 1977, aims to provide sustainable water supply, food security, and hydroelectric power generation. However, it has been largely neglected, leading to overreliance on borehole drilling in residential areas, which poses environmental risks. Former President Olusegun Obasanjo has called for its revitalization to address these issues and improve water management in Nigeria. |
Budget |
Location
Country | Nigeria |
State | Ogun |
City | Abeokuta |
Source
Source | Platform Times |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Residential, Power Generation (CCGT) |
Article published date | 2025-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
