Oyster Green Hybrid Five 35.6 MW Wind-Solar Hybrid Project
One of 9,183 projects Taiyo tracks in Andhra Pradesh.
Source: Mercomindia.com
The project consists of 21.6 MW of wind and 14 MW of solar capacity. Dalmia Cement (Bharat) has entered into agreements to acquire a 41% stake in Oyster Green Hybrid Five to source power from this hybrid project on a captive basis.
- Sector
- Wind, Power Generation (CCGT), Solar
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Oyster Green Hybrid Five 35.6 MW Wind-Solar Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of 21.6 MW of wind and 14 MW of solar capacity. Dalmia Cement (Bharat) has entered into agreements to acquire a 41% stake in Oyster Green Hybrid Five to source power from this hybrid project on a captive basis. |
Original sector | Energy |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Solar |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in India
- Mundra Power Plant Gujarat
- Vallur Conventional 1000MW Thermal Power Plant India
- Tapovan Vishnugad Hydroelectric Power Plant Uttarakhand
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Tamil Nadu Wind Farm
- Tiroda Super Critical Thermal Power Plant Maharashtra
- Polavaram Hydro Electric Project Andhra Pradesh
- East Coast Energy Private Limited (ECEPL)
