Ozama Bridge
Sector: Bridge • Location: Dominican Republic
Source: FCC Construction
The bridge over the River Ozama, known as the Juan Bosch Bridge, in honour of the writer and ex-president, establishes highway communication between the west and east of Santo Domingo. It is the straightening of the existing Juan Pablo Duarte Bridge, a metal suspension bridge constructed in the 50s.In order to achieve harmony with its surroundings, its design respects the silhouette of the Juan Pa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The bridge over the River Ozama, known as the Juan Bosch Bridge, in honour of the writer and ex-president, establishes highway communication between the west and east of Santo Domingo. It is the straightening of the existing Juan Pablo Duarte Bridge, a metal suspension bridge constructed in the 50s.In order to achieve harmony with its surroundings, its design respects the silhouette of the Juan Pablo Duarte suspension bridge but, instead of designing a bridge of the same type, a cable-stayed structure was adopted.The Ozama Bridge is a reinforced concrete structure having a total length of 647.10 metres. It can be divided into three sections: the viaduct providing east access, the main bridge and the west access viaduct.Its deck attains a maximum height of 35 metres over the river and its pylons are 63 metres high. It has five spans, the central one is 180 metres long and lateral compensation ones are 457.50 and 35.95 metres. It is 33.5 metres wide that can be broken down into four circulation roadways, two lanes for a future urban train and pedestrian pavements. The deck is supported by forty-eight double cable stays that are separated from each other by ten metres. An extra-dorsal pre-stressing solution was employed, with greater deck rigidity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
