logo
ProjectBid Results, Design Development

P-01 Perimeter Access Gate Replace

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Scope - The existing P-01 sliding gate is to be replaced with a high-speed electronic security gate as similarly found on other AOA access gates at the Airport. This replacement gate shall be a Wallace International Model PDXT trackless, post-driven, electrically operated, fast-acting, bi-fold SpeedGate (Owner Supplied). All structural columns, drive units, controllers, and gate panels are to be b

Status
Closed
Sector
Airport, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)
Location
San Diego, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about P-01 Perimeter Access Gate Replace

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “P-01 Perimeter Access Gate Replace” is an infrastructure initiative in the Airport sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results, Design Development

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - The existing P-01 sliding gate is to be replaced with a high-speed electronic security gate as similarly found on other AOA access gates at the Airport. This replacement gate shall be a Wallace International Model PDXT trackless, post-driven, electrically operated, fast-acting, bi-fold SpeedGate (Owner Supplied). All structural columns, drive units, controllers, and gate panels are to be by Wallace International to match existing Airport security systems (Owner Supplied). The proposed...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Airport, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project