The Afulilo Hydroelectric Project supports the Government's energy policy of developing indigenous renewable energy resources for generating electricity to replace high cost diesel fuel. The project consists of the following components: 1) civil works which include a composite gravity concrete and rockfilled dam, an intake structure, a pipeline, a surge chamber, a tailrace, a powerhouse, and a swi

Project Information FAQ

Project Information

5 Q
The project “P0WER (ADB)” is an infrastructure initiative in the Water Supply and Storage sector, located in Samoa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Afulilo Hydroelectric Project supports the Government's energy policy of developing indigenous renewable energy resources for generating electricity to replace high cost diesel fuel. The project consists of the following components: 1) civil works which include a composite gravity concrete and rockfilled dam, an intake structure, a pipeline, a surge chamber, a tailrace, a powerhouse, and a switchyard. Further to this, the project entails 2) the installation of electrical and mechanical equipment which includes a 4 MW turbine generator, auxiliary equipment, a set up transformer, and switchgear; 3) the construction of 23 km of 22 kV tranmission line, and upgrading of a 28 km section of a transmission line from 22 kV to 33 kV. Finally, the project involves 4) provisions for consulting services for detailed engineering and construction supervision. The project's overall objectives are to support the energy policy Government of Western Samoa of developing indigenous renewable energy resources for generating electricity at an economic cost to displace h electricity generated by burning imported diesel at Upolu's diesel pow station which consumes expensive imported spare parts and consumables. output of the project will supplement electricity generated by run-of-the-river hydrostations during the dry season, when output from is reduced due to low stream flows, requiring diesel generation to mee electricity demand. The project, which is currently under constructio about 65% complete, is located in the Upper Salani Basin some 26 km so of Apia. Afulilo will be the first hydroelectric development in Upolu provide over-season storage and will substantially increase hydro ener firm capacity during the dry season. The project involves constructio 20 meter high dam, together with a tunnel headrace and penstock to con water to a power station with two 2 MW turbine generators located at F Bay on the northeast coast of Upolu. The output from Afulilo will be transmitted to Apia via an existing feeder which is being upgraded fro to 33 kV as part of the project. It is estimated that the Afulilo pro will add approximately 24 GWh/year of average energy potential to the system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data