Source: World Bank Group
The Afulilo Hydroelectric Project supports the Government's energy policy of developing indigenous renewable energy resources for generating electricity to replace high cost diesel fuel. The project consists of the following components: 1) civil works which include a composite gravity concrete and rockfilled dam, an intake structure, a pipeline, a surge chamber, a tailrace, a powerhouse, and a swi
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Wind, Tunnel, Government, Hydro, Cement
- Location
- Samoa
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about P0WER (ADB)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Afulilo Hydroelectric Project supports the Government's energy policy of developing indigenous renewable energy resources for generating electricity to replace high cost diesel fuel. The project consists of the following components: 1) civil works which include a composite gravity concrete and rockfilled dam, an intake structure, a pipeline, a surge chamber, a tailrace, a powerhouse, and a switchyard. Further to this, the project entails 2) the installation of electrical and mechanical equipment which includes a 4 MW turbine generator, auxiliary equipment, a set up transformer, and switchgear; 3) the construction of 23 km of 22 kV tranmission line, and upgrading of a 28 km section of a transmission line from 22 kV to 33 kV. Finally, the project involves 4) provisions for consulting services for detailed engineering and construction supervision. The project's overall objectives are to support the energy policy Government of Western Samoa of developing indigenous renewable energy resources for generating electricity at an economic cost to displace h electricity generated by burning imported diesel at Upolu's diesel pow station which consumes expensive imported spare parts and consumables. output of the project will supplement electricity generated by run-of-the-river hydrostations during the dry season, when output from is reduced due to low stream flows, requiring diesel generation to mee electricity demand. The project, which is currently under constructio about 65% complete, is located in the Upper Salani Basin some 26 km so of Apia. Afulilo will be the first hydroelectric development in Upolu provide over-season storage and will substantially increase hydro ener firm capacity during the dry season. The project involves constructio 20 meter high dam, together with a tunnel headrace and penstock to con water to a power station with two 2 MW turbine generators located at F Bay on the northeast coast of Upolu. The output from Afulilo will be transmitted to Apia via an existing feeder which is being upgraded fro to 33 kV as part of the project. It is estimated that the Afulilo pro will add approximately 24 GWh/year of average energy potential to the system. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Samoa |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Wind, Tunnel, Government, Hydro, Cement |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project