logo

P2 Gold Gabbs Project

Sector: Power Generation (CCGT) • Location: Gabbs, Nevada, United States

Source: Discovery Alert

Project
Permitting And Feasibility Study Phase

The P2 Gold Gabbs project is a copper-gold porphyry deposit development in Nye County, Nevada. It involves mining and processing of copper and gold using SART technology and existing infrastructure to enable simultaneous recovery of both metals. The project covers approximately 4,500 hectares with three mineralised zones: Sullivan, Lucky Strike, and Gold Ledge. The project aims to increase through

Project Information FAQ

Project Information

4 Q
The project “P2 Gold Gabbs Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gabbs, Nevada, United States. Taiyo aggregates data on it from Discovery Alert.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

permitting and feasibility study phase

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The P2 Gold Gabbs project is a copper-gold porphyry deposit development in Nye County, Nevada. It involves mining and processing of copper and gold using SART technology and existing infrastructure to enable simultaneous recovery of both metals. The project covers approximately 4,500 hectares with three mineralised zones: Sullivan, Lucky Strike, and Gold Ledge. The project aims to increase throughput and accelerate mill start-up to improve production and financial metrics. Infrastructure such as paved road access, power transmission, water rights, and workforce availability are already in place, reducing development risk. The project is in the permitting and feasibility study phase with construction planned for 2027-2028 and first production expected in late 2027 to early 2028.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data