P5 Brighton Park Flyover CREATE Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construct a bridge to carry CN/Metra Heritage Corridor (2 tracks) overor under CSX and NS tracks on the CREATE Western Avenue Corridor (five tracks). This project includes associated signal, track and structural work - This project will alleviate delay and conflict between freight,intercity passenger, and commuter rail where these services intersect at the Brighton Park crossing, one of the busies
- Status
- Prospective
- Sector
- Car parking, Bridge, Rail, Mass Transit, Automotive, Commercial
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about P5 Brighton Park Flyover CREATE Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct a bridge to carry CN/Metra Heritage Corridor (2 tracks) overor under CSX and NS tracks on the CREATE Western Avenue Corridor (five tracks). This project includes associated signal, track and structural work - This project will alleviate delay and conflict between freight,intercity passenger, and commuter rail where these services intersect at the Brighton Park crossing, one of the busiest rail crossings in the U.S. The project will eliminate delays between two CREATE Corridors (the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Rail, Mass Transit, Automotive, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
