logo
ProjectUnder Construction

PA 183 Bridge Replacement Project

The status, timeline and source of this project. A free account opens every field.

Source: Berks Weekly

The PA 183 bridge replacement project involves replacing the existing concrete-encased steel I-beam bridge with a new concrete box beam bridge in Reading. The new structure will be slightly shorter and narrower than the current bridge, which was built in 1916.

Status
Under Construction
Sector
Steel, Bridge, Cement, Metal
Location
Reading, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Berks Weekly

ConstructChat

Ask ConstructChat about PA 183 Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA 183 Bridge Replacement Project” is an infrastructure initiative in the Steel sector, located in Reading, Pennsylvania, United States. Taiyo aggregates data on it from Berks Weekly.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The PA 183 bridge replacement project involves replacing the existing concrete-encased steel I-beam bridge with a new concrete box beam bridge in Reading. The new structure will be slightly shorter and narrower than the current bridge, which was built in 1916.

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Reading

Source

Source

Berks Weekly

URL

More Details

Record type

Project

Sector

Steel, Bridge, Cement, Metal

Article published date

2025-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project