PA 183 Bridge Replacement Project
The status, timeline and source of this project. A free account opens every field.
Source: Berks Weekly
The PA 183 bridge replacement project involves replacing the existing concrete-encased steel I-beam bridge with a new concrete box beam bridge in Reading. The new structure will be slightly shorter and narrower than the current bridge, which was built in 1916.
- Status
- Under Construction
- Sector
- Steel, Bridge, Cement, Metal
- Location
- Reading, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Berks Weekly
ConstructChat
Ask ConstructChat about PA 183 Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The PA 183 bridge replacement project involves replacing the existing concrete-encased steel I-beam bridge with a new concrete box beam bridge in Reading. The new structure will be slightly shorter and narrower than the current bridge, which was built in 1916. |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Reading |
Source
Source | Berks Weekly |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Cement, Metal |
Article published date | 2025-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
