PAC Restrooms Improvements
Sector: Power Transmission • Location: Big Bear Lake, California, United States of America
Source: Dodge USA
for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for the PAC Restrooms Improvements Project--This project generally includes demolition of existing restroom toilet partitions, baby changing stations, counter tops, sinks, faucets, toilets, urinals, paper towel dispensers, lights, wall and floor tile, to
- Status
- Closed
- Sector
- Power Transmission, Cement, Government, Residential, Power Generation (CCGT), Forest Products and Packaging, Manufacturing (Industrial), Commercial
- Location
- Big Bear Lake, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PAC Restrooms Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for the PAC Restrooms Improvements Project--This project generally includes demolition of existing restroom toilet partitions, baby changing stations, counter tops, sinks, faucets, toilets, urinals, paper towel dispensers, lights, wall and floor tile, toilet flanges in concrete floor and moving to new location, drywall and soffit framing, mirrors, e... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Big Bear Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Government, Residential, Power Generation (CCGT), Forest Products and Packaging, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
