logo
ProjectPlanned

Pace Digitek 100 MW Solar-BESS Project

One of 9,281 projects Taiyo tracks in Andhra Pradesh.

Source: Saur Energy

A proposed 100 MW solar project coupled with 50 MW Battery Energy Storage System (BESS) at the NP Kunta Pooling Station in Andhra Pradesh. The project faced a delay in submitting Connectivity Bank Guarantees, which was condoned by CERC, directing CTUIL to restore connectivity and process the guarantees.

Status
Prospective
Sector
Solar, Energy Storage
Location
Andhra Pradesh, India
Updated
22 Jul 2026
Source
Saur Energy

ConstructChat

Ask ConstructChat about Pace Digitek 100 MW Solar-BESS Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pace Digitek 100 MW Solar-BESS Project” is an infrastructure initiative in the Solar sector, located in Andhra Pradesh, India. Taiyo aggregates data on it from Saur Energy.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 100 MW solar project coupled with 50 MW Battery Energy Storage System (BESS) at the NP Kunta Pooling Station in Andhra Pradesh. The project faced a delay in submitting Connectivity Bank Guarantees, which was condoned by CERC, directing CTUIL to restore connectivity and process the guarantees.

Original sector

Energy

Budget

Location

Country

India

State

Andhra Pradesh

Source

Source

Saur Energy

URL

More Details

Record type

Project

Sector

Solar, Energy Storage

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project