Pace Digitek 100 MW Solar-BESS Project
One of 9,281 projects Taiyo tracks in Andhra Pradesh.
Source: Saur Energy
A proposed 100 MW solar project coupled with 50 MW Battery Energy Storage System (BESS) at the NP Kunta Pooling Station in Andhra Pradesh. The project faced a delay in submitting Connectivity Bank Guarantees, which was condoned by CERC, directing CTUIL to restore connectivity and process the guarantees.
- Status
- Prospective
- Sector
- Solar, Energy Storage
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Saur Energy
ConstructChat
Ask ConstructChat about Pace Digitek 100 MW Solar-BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed 100 MW solar project coupled with 50 MW Battery Energy Storage System (BESS) at the NP Kunta Pooling Station in Andhra Pradesh. The project faced a delay in submitting Connectivity Bank Guarantees, which was condoned by CERC, directing CTUIL to restore connectivity and process the guarantees. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | Saur Energy |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage |
Article published date | 2026-07-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
