logo
ProjectWork Start - Appointed Date

Pachwara South Coal Block

Sector: Geothermal • Location: Dumka, Jharkhand, India

Source: India Investment Grid (IIG)

Information NLC India Limited [NLCIL] has come up with Pachwara South Coal Block with a ticket size of 2242.9 INR Crores. This project in Coal sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project NUPPL has been allotted with the Pachwara South Coal Block, in the State of Jharkhand,

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT), Road, Government, Commercial
Location
Dumka, Jharkhand, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Pachwara South Coal Block

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pachwara South Coal Block” is an infrastructure initiative in the Geothermal sector, located in Dumka, Jharkhand, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

work start - appointed date

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information NLC India Limited [NLCIL] has come up with Pachwara South Coal Block with a ticket size of 2242.9 INR Crores. This project in Coal sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project NUPPL has been allotted with the Pachwara South Coal Block, in the State of Jharkhand, with a capacity of 9.0 MTPA [Normative] &13.50 MTPA [Peak] at an estimated cost of Rs. 2242.90 Cr. In order to develop and operate the above Coal Block, MIPL GCL Infra contract Private Limited has been appointed as the Mine Developer Operator [MDO]. Geological Report [GR], Mining Plan & Mine closure plan approved by MoC. End users- Ghatampur Thermal Power Project [3x660 MW], UP Financial progress achieved as on 31.01.2024 is 4.71 percent

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

Jharkhand

City

Dumka

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Road, Government, Commercial

Article published date

2024-02-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project