Pacific and Davis Street Reconstruction
Sector: Water Supply and Storage • Location: Milverton, Ontario, Canada
Source: Dodge USA
The work includes: 4900 m3 of earth excavation 2900 tonnes of Granular A 6050 tonnes of Granular B 690 tonnes of hot mix asphalt 825 m2 of concrete sidewalk 975 m of concrete curb and gutter 570 linear metres of 200 mm to 375 mm diameter sanitary sewer 650 linear metres of 300 mm to 900 mm diameter storm sewer 600 linear metres of 150mm to 250mm diameter watermain
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes: 4900 m3 of earth excavation 2900 tonnes of Granular A 6050 tonnes of Granular B 690 tonnes of hot mix asphalt 825 m2 of concrete sidewalk 975 m of concrete curb and gutter 570 linear metres of 200 mm to 375 mm diameter sanitary sewer 650 linear metres of 300 mm to 900 mm diameter storm sewer 600 linear metres of 150mm to 250mm diameter watermain |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
