logo
ProjectPlanning Schematics

Pacific Proving 360 MW Data Center

Planning schematics · Arizona · Last reported Dec 2024

Source: Dodge USA

Pacific Proving is looking to transform the 178 acres into a "data center and technology employment campus." A site plan shows the campus would include 11 buildings that span more than 2.5 million square feet collectively with nine of the 11 buildings eyed for data center or flex-use. The other two buildings would comprise a three-story, 150,000-square-foot office building and a 95,000-square-foot

Status
Prospective
Sector
Manufacturing (Industrial), Warehouse, Residential, Data Center, Commercial, Power Generation (CCGT), Steel
Location
Mesa, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pacific Proving 360 MW Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pacific Proving 360 MW Data Center” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Mesa, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pacific Proving is looking to transform the 178 acres into a "data center and technology employment campus." A site plan shows the campus would include 11 buildings that span more than 2.5 million square feet collectively with nine of the 11 buildings eyed for data center or flex-use. The other two buildings would comprise a three-story, 150,000-square-foot office building and a 95,000-square-foot warehouse. An electrical substation to supply additional power is also in the proposal.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Mesa

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Warehouse, Residential, Data Center, Commercial, Power Generation (CCGT), Steel

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project