Pacifica Ingrid B Lacy MS Classroom Bldg Replacement REBID
Closed · California · Last reported Jul 2025
Source: Dodge
Replace (1) 24 x40 portable classrooms. The construction duration is from July 3rd, 2025 till end of Sep. The scope of work under this contract includes the following: The project includes site work and site utilities the following: Demolition of (1) existing portable, and dispose of all demolished materials off site, including all contents including furniture inside the portable; Water, sewer, st
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Government, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Pacifica, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pacifica Ingrid B Lacy MS Classroom Bldg Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace (1) 24 x40 portable classrooms. The construction duration is from July 3rd, 2025 till end of Sep. The scope of work under this contract includes the following: The project includes site work and site utilities the following: Demolition of (1) existing portable, and dispose of all demolished materials off site, including all contents including furniture inside the portable; Water, sewer, storm drain, electrical, fire alarm, data/ low voltage, clock and speaker system, intrusion alarm, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Pacifica |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Government, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
