Pacifico Mexinol Project
The owner, status and timeline of this project. A free account opens every field.
Source: Market Screener
Veolia has been chosen to design the water treatment system for the Pacifico Mexinol facility, a methanol production unit due to come on stream in Mexico by 2028. The project aims to establish a closed circuit to treat and recycle municipal wastewater, avoiding the discharge of over 8.5 million m3 into Ohuira Bay annually.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- Market Screener
ConstructChat
Ask ConstructChat about Pacifico Mexinol Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Veolia has been chosen to design the water treatment system for the Pacifico Mexinol facility, a methanol production unit due to come on stream in Mexico by 2028. The project aims to establish a closed circuit to treat and recycle municipal wastewater, avoiding the discharge of over 8.5 million m3 into Ohuira Bay annually. |
Location
Country | Mexico |
Source
Source | Market Screener |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
