logo

Pacifico Solar Power Plants

Sector: Solar • Location: Honduras

Source: World Bank Group

Project
Active

Participaciones Choluteca Dos S.A., a subsidiary of the American company Sunedison, was granted the authorization to build and operate three solar power plants located at the southern region of Choluteca. The electricity generated by the power plants was set to be directed to the country's national grid (a 20-year power purchase agreement (PPA) was signed with Honduras’s state-owned company Empres

Status
Prospective
Sector
Solar, Warehouse, Power Generation (CCGT), Government, Commercial
Location
Honduras
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pacifico Solar Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pacifico Solar Power Plants” is an infrastructure initiative in the Solar sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Participaciones Choluteca Dos S.A., a subsidiary of the American company Sunedison, was granted the authorization to build and operate three solar power plants located at the southern region of Choluteca. The electricity generated by the power plants was set to be directed to the country's national grid (a 20-year power purchase agreement (PPA) was signed with Honduras’s state-owned company Empresa Nacional de Energía Eléctrica). The power plants were named Pacific I, Choluteca I and Choluteca II, with an installed capacity of 20 MW (23.2 MWp), 20 MW (23.3 MWp) and 30 MW (35.0 MWp), respectively. The project cost was estimated at US$ 210 million. Operations were expected to commence in the second semester of 2015. Financial closure was achieved in September 2014. The IFC provided direct financing for US$85.9 million, including US$65.5 million senior debt and US$20 million subordinated debt. IFC’s funding included US$19.5 million in concessional senior and subordinated debt from the Clean Technology Fund, as well as US$20.7 million senior debt from institutional investors under the Managed Co-Lending Portfolio Program. The IFC played a leading role in bringing CABEI and OFID, which provided US$45.0 million and US$15.0 million respectively. The total financing for the project is approximately US$146 million. In June 2015, MIGA issued a US$ 56.7 million guarantee to Sun Edison's project in Choluteca. https://www.miga.org/pages/projects/project.aspx?pid=1448

Original sector

Energy

Budget

Location

Country

Honduras

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Warehouse, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project