logo
ProjectCompleted

Pacifico Solar

Sector: Raw Materials • Location: Honduras

Source: International Finance Corporation (IFC)

The project entails the development of three solar photovoltaic (PV) power plants with aggregate capacity of 78.6 MW in Choluteca municipality, which is located in the southernmost part of Honduras, some 40 km inland from the Pacific Ocean. Construction of the Pacifico I and Choluteca I and II plants is expected to begin in late Q32014 and all have very similar technical characteristics. Pacifico

Status
Closed
Sector
Raw Materials, Road, Power Generation (CCGT), Solar, Government
Location
Honduras
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Pacifico Solar

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pacifico Solar” is an infrastructure initiative in the Raw Materials sector, located in Honduras. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the development of three solar photovoltaic (PV) power plants with aggregate capacity of 78.6 MW in Choluteca municipality, which is located in the southernmost part of Honduras, some 40 km inland from the Pacific Ocean. Construction of the Pacifico I and Choluteca I and II plants is expected to begin in late Q32014 and all have very similar technical characteristics. Pacifico I will have a nominal installed capacity of 23 MWp and is expected to generate 52 GWh per annum. The project will be located on 120 ha of agricultural pasture land in an area with strong irradiation equivalent to 6.0-6.5 kWh/m2/day. The Choluteca I and II projects are very similar to Pacifico I and are located next to each other within 151 ha of modified habitat, also composed of pastures and agricultural land. With an aggregate installed capacity of 58 MWp, these plants are expected to generate 112 GWh per annum. The three projects are located within 5 km of one another and will be interconnected to Santa Lucia - an existing substation located in the outskirts of San Jose de la Landa – via two dedicated 34.5 kV single pole transmission lines. Pacifico I’s transmission line will be 4 kilometers long with right-of-way (RoW) of 15 meters, and Choluteca I and II will share a 7-kilometer transmission line with the same RoW width. Given the peri-urban siting of the Santa Lucia substation, the last 500 meters of the two transmission lines will be buried. The equipment will consist of proven ground mounted photovoltaic crystalline modules and single-axis trackers from SunEdison, and inverters from Bonfiglioli/Ingeteam/SMA or equivalent. Construction is expected to be completed by Q1 2015.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Honduras

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Road, Power Generation (CCGT), Solar, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project