Pacifico Solar

Sector: Solar • Location: Honduras

Source: International Finance Corporation (IFC)

Project
Completed

The project entails the development of three solar photovoltaic (PV) power plants with aggregate capacity of 78.6 MW in Choluteca municipality, which is located in the southernmost part of Honduras, some 40 km inland from the Pacific Ocean. Construction of the Pacifico I and Choluteca I and II plants is expected to begin in late Q32014 and all have very similar technical characteristics. Pacifico

Project Information FAQ

Project Information

4 Q
The project “Pacifico Solar” is an infrastructure initiative in the Solar sector, located in Honduras. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the development of three solar photovoltaic (PV) power plants with aggregate capacity of 78.6 MW in Choluteca municipality, which is located in the southernmost part of Honduras, some 40 km inland from the Pacific Ocean. Construction of the Pacifico I and Choluteca I and II plants is expected to begin in late Q32014 and all have very similar technical characteristics. Pacifico I will have a nominal installed capacity of 23 MWp and is expected to generate 52 GWh per annum. The project will be located on 120 ha of agricultural pasture land in an area with strong irradiation equivalent to 6.0-6.5 kWh/m2/day. The Choluteca I and II projects are very similar to Pacifico I and are located next to each other within 151 ha of modified habitat, also composed of pastures and agricultural land. With an aggregate installed capacity of 58 MWp, these plants are expected to generate 112 GWh per annum. The three projects are located within 5 km of one another and will be interconnected to Santa Lucia - an existing substation located in the outskirts of San Jose de la Landa – via two dedicated 34.5 kV single pole transmission lines. Pacifico I’s transmission line will be 4 kilometers long with right-of-way (RoW) of 15 meters, and Choluteca I and II will share a 7-kilometer transmission line with the same RoW width. Given the peri-urban siting of the Santa Lucia substation, the last 500 meters of the two transmission lines will be buried. The equipment will consist of proven ground mounted photovoltaic crystalline modules and single-axis trackers from SunEdison, and inverters from Bonfiglioli/Ingeteam/SMA or equivalent. Construction is expected to be completed by Q1 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data