Package Water Treatment System Replacement Lake Rabun WTP
Sector: Water Supply and Storage • Location: Rabun Gap, Georgia, United States of America
Source: Dodge USA
The Project consists of, but is not limited to the following major elements: Enhancements to existing 2.0 MGD Water Treatment Facility. Major components include restoration of 2 each 1.0 MGD package filter units and associated controls with new filter media and associated internal components of each filter unit. Each filter unit will be converted from a Roberts system to a Trident system, manufact
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment
- Location
- Rabun Gap, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Package Water Treatment System Replacement Lake Rabun WTP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of, but is not limited to the following major elements: Enhancements to existing 2.0 MGD Water Treatment Facility. Major components include restoration of 2 each 1.0 MGD package filter units and associated controls with new filter media and associated internal components of each filter unit. Each filter unit will be converted from a Roberts system to a Trident system, manufactured by Westech Engineering, Inc.. All controls shall be upgraded as well. And existing blowers s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Rabun Gap |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
