logo
ProjectClosed

Packsaddle Road Reconstruction

One of 10,000+ projects Taiyo tracks in Idaho.

Source: Dodge USA

1.5 mile road reconstruction of W4000N. It consists of approximately 2.8 acres of clearing and grubbing, 12,450cy of pit run, 2,800 cy of 2" minus pit run, 2,600 cy of 3/4" minus, 1,900 cy of hot mix asphalt, 22,600 sy of geotextile fabric, 1.9 acres of seeding, 90 feet of 18" corrugated metal culvert installation, 147 feet of 24" corrugated metal culvert installation, 62 feet of 36" corrugated me

Status
Closed
Sector
Road, Metal, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Water Supply and Storage, Government
Location
Driggs, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Packsaddle Road Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Packsaddle Road Reconstruction” is an infrastructure initiative in the Road sector, located in Driggs, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1.5 mile road reconstruction of W4000N. It consists of approximately 2.8 acres of clearing and grubbing, 12,450cy of pit run, 2,800 cy of 2" minus pit run, 2,600 cy of 3/4" minus, 1,900 cy of hot mix asphalt, 22,600 sy of geotextile fabric, 1.9 acres of seeding, 90 feet of 18" corrugated metal culvert installation, 147 feet of 24" corrugated metal culvert installation, 62 feet of 36" corrugated metal culvert installation, and other miscellaneous work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Driggs

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Metal, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Water Supply and Storage, Government

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project