Pad-0b Construction Modifications
Sector: Water Supply and Storage • Location: Wallops Island, Virginia, United States of America
Source: Dodge
Cutting, removing, and disposing of existing asphalt and concrete sections. Moving/removing existing riprap. Providing an aggregate surface up to 24 inches thick in specified areas. Additional fill of aggregate surface may be required based on the design package and engineering specifications. Constructing a liquid oxygen (LOX) dump pond wall. Constructing a utility trench per the drawing package.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Wallops Island, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pad-0b Construction Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cutting, removing, and disposing of existing asphalt and concrete sections. Moving/removing existing riprap. Providing an aggregate surface up to 24 inches thick in specified areas. Additional fill of aggregate surface may be required based on the design package and engineering specifications. Constructing a liquid oxygen (LOX) dump pond wall. Constructing a utility trench per the drawing package. Building containment basin walls. Constructing precast concrete blocks with various styles of pi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Wallops Island |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
