Paddle River Dam Reservoir
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
The Smith Farm Slumping is located within NW of Sec. 35, Twp 56, Rge 8, W5M approximately middle of the North West bank of Paddle River Dam Reservoir. The reservoir is located on the upper reaches of the Paddle River - a tributary of the Pembina River, in north central Alberta as shown in Figure No.1. The slumping is accessible via Highway No. 43 and Range Rd 82. The reservoir consists of the eart
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Raw Materials, Road, Commercial, Waste Processing and Treatment
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Paddle River Dam Reservoir
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Smith Farm Slumping is located within NW of Sec. 35, Twp 56, Rge 8, W5M approximately middle of the North West bank of Paddle River Dam Reservoir. The reservoir is located on the upper reaches of the Paddle River - a tributary of the Pembina River, in north central Alberta as shown in Figure No.1. The slumping is accessible via Highway No. 43 and Range Rd 82. The reservoir consists of the earthen dam, the service spillway, and the low-level outlet structure. The main purpose of the projec... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Raw Materials, Road, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
