logo
ProjectClosed

Paddock Bridge B035087 Replacement

Closed · Ontario · Last reported Aug 2023

Source: Dodge USA

Replacement of the existing Paddock bridge with a new single-span bridge over Mill Creek. The intent of this Bid Call is to obtain offers to perform all works required for the Replacement of Paddock (B035087) Bridge located on Wellington Road 35, in Town of Puslinch, the County of Wellington, Ontario

Status
Closed
Sector
Bridge, Road, Government, Commercial, Manufacturing (Industrial)
Location
Wellington, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Paddock Bridge B035087 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Paddock Bridge B035087 Replacement” is an infrastructure initiative in the Bridge sector, located in Wellington, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the existing Paddock bridge with a new single-span bridge over Mill Creek. The intent of this Bid Call is to obtain offers to perform all works required for the Replacement of Paddock (B035087) Bridge located on Wellington Road 35, in Town of Puslinch, the County of Wellington, Ontario

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Wellington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project