PA/DOT: Century Farm Road Culvert Replacement
Sector: Water Supply and Storage • Location: Hanover Township, Pennsylvania, United States of America
Source: Dodge
Culvert Replacement and Reconstruction of Roadway around the culvert as well as drainage improvements, guide rail and end treatment updates and signing and pavement marking replacement as indicated on the approved drawings for STATE ROUTE 3034 SECTION B02 in BEAVER COUNTY, HANOVER TOWNSHIP. This project being situated as follows: Approximately 5,000' to the east of the SR 0018 intersection at Segm
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Rail, Mass Transit, Road, Commercial
- Location
- Hanover Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PA/DOT: Century Farm Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Culvert Replacement and Reconstruction of Roadway around the culvert as well as drainage improvements, guide rail and end treatment updates and signing and pavement marking replacement as indicated on the approved drawings for STATE ROUTE 3034 SECTION B02 in BEAVER COUNTY, HANOVER TOWNSHIP. This project being situated as follows: Approximately 5,000' to the east of the SR 0018 intersection at Segment 0220, Offset 2462 to the intersection of SR 0030 (Lincoln Highway) at Segment 0020, Offset 2662 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Hanover Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Rail, Mass Transit, Road, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
