logo
ProjectConstruction Documents

PA/DOT: Forrest Ave Resurface

Sector: Commercial • Location: New Freedom, Pennsylvania, United States of America

Source: Dodge USA

Resurface PA 851 (Main Street/Second Street) from State Route 3001 (North Main Street) to State Route 3004 (Hilderbrand Road) in Shrewsbury Township, Railroad Borough, New Freedom Borough, and Shrewsbury Borough

Status
Closed
Sector
Commercial, Rail, Manufacturing (Industrial), Road
Location
New Freedom, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: Forrest Ave Resurface

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: Forrest Ave Resurface” is an infrastructure initiative in the Commercial sector, located in New Freedom, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Resurface PA 851 (Main Street/Second Street) from State Route 3001 (North Main Street) to State Route 3004 (Hilderbrand Road) in Shrewsbury Township, Railroad Borough, New Freedom Borough, and Shrewsbury Borough

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

New Freedom

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Rail, Manufacturing (Industrial), Road

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project