PA/DOT: Foster Brook Concrete Box Culvert
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge
The description and location of the project is as follows: This work is the furnishing and placement of an 8.0' x 4.0' precast reinforced concrete box culvert and inlet and outlet sections over an Unnamed trib. To Foster Brook at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the base, binder, and wearing courses and furnishing
- Status
- Closed
- Sector
- Waste Processing and Treatment, Rail, Mass Transit, Road, Water Supply and Storage, Commercial, Cement
- Location
- Bradford, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PA/DOT: Foster Brook Concrete Box Culvert
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The description and location of the project is as follows: This work is the furnishing and placement of an 8.0' x 4.0' precast reinforced concrete box culvert and inlet and outlet sections over an Unnamed trib. To Foster Brook at a Department prepared site, construction of approach and roadway consisting of Superpave Asphalt Mixture Designs for the base, binder, and wearing courses and furnishing and placement of guide rail, and miscellaneous construction all within a length of approximately ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Bradford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Rail, Mass Transit, Road, Water Supply and Storage, Commercial, Cement |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
