logo
ProjectClosed

PA/DOT: I-79 Interstate Concrete Patching

Closed · Pennsylvania · Last reported Aug 2024

Source: Dodge USA

Interstate Concrete Patching on Interstate 80 from MM 15 to 46 and Interstate 79 from MM 110 to 136 and plug dam replacement on eight structures on Interstate 79 from MM 118 to 136 in Mercer and Venango Counties.

Status
Closed
Sector
Hydro, Cement, Road, Commercial, Manufacturing (Industrial), Water Supply and Storage
Location
Mercer, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: I-79 Interstate Concrete Patching

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: I-79 Interstate Concrete Patching” is an infrastructure initiative in the Hydro sector, located in Mercer, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Interstate Concrete Patching on Interstate 80 from MM 15 to 46 and Interstate 79 from MM 110 to 136 and plug dam replacement on eight structures on Interstate 79 from MM 118 to 136 in Mercer and Venango Counties.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Mercer

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Cement, Road, Commercial, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project